The Metrics screen is the catalogue of your project’s indicators. Everything a metric looks like in reports — its name, number format, colour, calculation rule — is set here and read by every report of the project at once.
What you see here
Metrics are grouped by data source: one section per integration, with Common metrics first. Inside a section they are laid out along the funnel: Ads → Site → Leads → Target → Deals → Sales.
Table columns:
- Metric — the label, a short context next to it, and the key on the second line.
Labels in the registry are not unique (dozens of metrics are called
CR); only the key is, and formulas and saved reports address the metric by it. - Format — how the number looks: money, percent, units, decimals.
- How it is calculated — a formula for a derived metric; for a base one, the source it reads.
- Definition — where the description came from: KO standard, project metric, copy of standard, or standard, edited with the list of differences.
- Used in — where the key already appears: reports, views, plans, dashboards. Shown by the names of those places, not as a count.
- State — Shown or Hidden, plus a Not calculated mark with the reason.
The dot to the left of the name is the metric’s colour. Colour carries the funnel stage, while shape carries the role: a volume is a filled dot, a rate or a conversion is a ring.
The last row of a section is N more hidden: hidden metrics are collapsed, because a project with connectors usually has more of them than shown ones.
Set it up for your question
In the section toolbar:
- Search metric — by name and by key.
- Source — filter by integration. Unticking a source does not remove its section; it collapses into a “show N metrics of this source” line, so the map of the project’s sources stays visible.
- Status — shown, hidden, problems only.
- Used in — Used somewhere or Not used anywhere. Without this filter, “hide this metric” is a blind decision.
- View — table height.
- Add metric… — a metric of your own.
Edit a metric
- Click a row — the editor opens on the right.
- Calculation — the formula. Empty means the metric reads its source as is; to change the calculation, write a formula from that source.
- Number format — format, decimals, aggregation over periods, attribution.
- Display — name, description, group, colour, highlight.
- Save.
Editing a standard metric does not change it for other projects: KO creates a project copy that overrides the standard definition. That is why the editor offers Restore standard — it drops the copy rather than “resetting the values”.
Create your own metric
- Add metric… in the section toolbar.
- Set the key — latin letters, digits and
_. The key is asked for once: formulas and saved reports address the metric by it, so renaming the key would mean a different metric. - From there it is an ordinary edit.
Only your own metric can be deleted. A copy of a standard one loses its override, and a standard one can be hidden but not deleted. A metric that is used somewhere is deleted on the second click — the first refusal names how many places use it.
How to read it
A formula rewrites the numbers across the whole project history, not from today. The editor says so next to the field: a metric is a reading rule, not a stored record, and a new rule applies to every period at once.
The Check value button calculates the metric over the last 30 days right in the editor — the fastest way to be sure the formula is not broken.
“Not calculated” means the definition does not resolve against this project’s data: no source, no markup, or a reference to a metric that does not exist. The reason is printed under the formula, and the Problems only filter collects such metrics into one list.
A hidden metric is not a deleted one. It stays in the registry, keeps being calculated in saved reports and keeps labelling their columns; it is simply not offered in composition pickers.
Some labels come from the KO dictionary. For those metrics a project name only applies where the dictionary has no entry — the editor says so, so that the edit does not look ignored.
An empty colour means “by group”. Set a colour of your own only when the metric should deliberately stand out from its group.
If there are no numbers
- “No metrics found” — the filters or the search are doing it. Clear the filters: more often than not the metric is there, hidden by status.
- The metric is not in the list at all — no source has brought it in. Metrics arrive with a connector sync; if the connector was just set up, wait for the first sync.
- The metric is there but the report shows a dash — check the State column: it will say “Not calculated”, with the reason.
What’s next to it
- The Metrics section — how these indicators look in a report.
- Settings → Fields — the project’s other axis: the dimensions metrics are broken down by.
- How a report works — where the metric composition is chosen for a particular section.